Mr. Yamasaki has 22 years of experience as a geotechnical engineer. He has worked on seismic evaluation of embankment dams and foundation soils, ground improvement, landslide remediation, and structure foundations. He has built a successful track record in the application of engineering principles to the solution of especially complex geotechnical problems. A few of Mr. Yamasaki’s representative work projects include:
- Embankment Dam Seismic Stability and Deformation Evaluations, Oak Grove Hydroelectric Project, Oregon
- Tanana River Bridge, Tok, Alaska
- Driven Pile Design and Evaluations, Bear Creek Bridge, Medford, Oregon
- Plate Load Testing, Trojan Nuclear Power Plant Decommissioning, Rainier, Oregon
- Wastewater Treatment Plant Expansion Foundation Improvements, Tillamook County, Oregon
- Liquefaction Evaluation and Ground Improvement, Port Westward Generating Plant, Clatskanie, Oregon
- FWD Data Analysis and Pavement Design, Warner Highway Realignment, Lakeview, Oregon
- Large-Scale Laboratory Testing, Sewer Line Backfill Settlement, Richland, Washington
- North Transmission Pipeline Excavation Shoring and Soil Improvement, Cornelius, Oregon
- Shear Pile Design, Depoe Bay Sea Wall, Depoe Bay, Oregon
- Design and Modification of Foundations, Green Springs Drive Bridge, Klamath Falls, Oregon
- Static and Seismic Stability of Willamette Falls Dam, West Linn, Oregon
- Interstate 84 Sandy River Bridge Investigation, Troutdale, Oregon
- Earthfill Dam Construction, Frog Lake Central Dam, Three Lynx, Oregon
- Municipal Water Supply System Expansion Facility Foundations, Glendale, Oregon
- Willamette Falls Dam (Section G-G) Stability Analysis, West Linn, Oregon
- Westside Light Rail Zoo Station Exploration and Instrumentation, Portland, Oregon
- St. Johns Landfill Closure Clay Liner, Portland, Oregon
- Jackson Creek Bridge Foundations, Jacksonville, Oregon
|