Cornforth Consultants
  • Home
  • Services
    • Earth & Rockfill Dams
    • Reservoirs, Canals, and Levees
    • Spillway Safety Inspections
    • Landslides and Rockfall
    • Earthquake Engineering
    • Geologic Hazards
    • Geotechnical Site Characterization
    • Hydrogeology
    • Expert Witness
    • Concrete Dams and Locks
    • Geotechnical Instrumentation
    • Deep and Shallow Foundations
    • Geotechnical Manuals
  • Industries
    • Water Resources
    • Energy
    • Natural Resources
    • Industrial
    • Transportation
    • Ports and Airports
    • Expert Witness
  • Projects
    • Earth and Rockfill Dams >
      • Barney Reservoir
      • Frog Lake Reservoir
      • Iron Gate Dam Raise
      • McGuire Dam Raise
      • Bonneville Cofferdam
      • Bull Run No. 2 Seismic Stability Analysis
    • Levees and Canals >
      • Libby Dike Rehab.
      • St. Johns Dike Stabilization
      • Cowlitz River Levees
      • Swift Canal Failure
    • Earthquake Engineering >
      • Barney Dam Seismic Analysis
      • Fern Hill WTP Liquefacation Study
      • Bull Run No. 2 Seismic Stability Analysis
      • Mt. Tabor Seismic Stability Analysis
      • Port Westward Power Plant Seismic Design
    • Rock Slopes and Tunnels >
      • Libby Rockfall Mitigation
      • Sandy River Pipeline Tunnels
      • Ketchikan Third Avenue Extension
      • Sain Creek Water Supply Tunnel
      • Montana Rockfall Hazard Rating System
    • Foundations >
      • Port Westward Power Plant
      • Cascade Locks Casino
      • Air National Guard Hangar
      • Biglow Canyon Windfarm
      • Oakridge Water System Improvements
    • Concrete Dams and Locks >
      • John Day Lock & Dam
      • Marmot Dam Removal
      • The Dalles Dam
      • Willamette Falls Dam
      • Bonneville Dam
    • Transportation >
      • OTIA Cracked Bridge Geotechnical Baselines
      • Newburg Dundee Bypass Design DEIS
      • I-84 Sandy River Bridge Investigation
      • Tanana River Bridge Foundation, Tok, Alaska
      • Montana RHRS Implementation
      • Ketchikan Third Avenue Extension
    • Ports and Airports >
      • Navy CVN Drydock
      • Depoe Bay Seawall Distress
      • Willamette Falls Flow Control Structure
      • Air National Guard Hangar
    • Water and Wastewater >
      • Fern Hill Water Treatment Plant
      • Tualatin Valley North Transmission Line
      • Evaluation of 28 Water Storage Facilities
      • City of Sandy Water Treatment Plant
      • Mt. Tabor Reservoir No. 5 Cap Study
      • Oakridge Water System Improvements
  • Staff
  • Resources
  • Careers
    • Geotechnical Engineer
  • Contact Us

Fern Hill Water Treatment Plant

Forest Grove, Oregon
The Fern Hill Water Treatment Plant provides drinking water to the cities of Hillsboro, Beaverton, Forest Grove and the Tualatin Valley Water District (Joint Water Commission). Due to regional growth, the Commission increased the capacity of the plant by 20 million gallons per day. Cornforth Consultants provided geotechnical design for the expansion.

The plant expansion consisted of an additional surge basin, a new filter building, and an additional sedimentation basin. These new facilities were founded on loose, granular soil near the Tualatin River - material that could potentially liquefy during an earthquake.

​Cornforth's investigation included drilling, sampling and testing of loose cohesionless silt. Analyses were performed to evaluate liquefaction-induced settlement and lateral spread. Recommendations were provided for dry, bottom-feed stone columns to improve ground conditions and minimize settlement. Design recommendations were also provided for allowable bearing capacity, site grading, temporary shoring and dewatering, and lateral earth-pressures. Cornforth also provided full-time construction observation during installation of the stone columns, and part-time Quality Assurance/Quality Control for foundation excavation and preparation.
Type 2 RHRS Slope on Highway 26
Fern Hill Water Treatment Plant

​Services Provided:

  • Site characterization
  • Geologic hazard evaluation
  • Subsurface investigation
  • Laboratory testing of soils
  • Dynamic triaxial shear strength testing
  • Seismic stability analysis
  • Liquefaction analyses
  • Analysis of foundation bearing capacity
  • Design of mitigation for potential liquefaction
  • Ground densification
  • Bearing capacity
  • Plans and specifications
  • Construction quality control
  • Home
  • Services
    • Earth & Rockfill Dams
    • Reservoirs, Canals, and Levees
    • Spillway Safety Inspections
    • Landslides and Rockfall
    • Earthquake Engineering
    • Geologic Hazards
    • Geotechnical Site Characterization
    • Hydrogeology
    • Expert Witness
    • Concrete Dams and Locks
    • Geotechnical Instrumentation
    • Deep and Shallow Foundations
    • Geotechnical Manuals
  • Industries
    • Water Resources
    • Energy
    • Natural Resources
    • Industrial
    • Transportation
    • Ports and Airports
    • Expert Witness
  • Projects
    • Earth and Rockfill Dams >
      • Barney Reservoir
      • Frog Lake Reservoir
      • Iron Gate Dam Raise
      • McGuire Dam Raise
      • Bonneville Cofferdam
      • Bull Run No. 2 Seismic Stability Analysis
    • Levees and Canals >
      • Libby Dike Rehab.
      • St. Johns Dike Stabilization
      • Cowlitz River Levees
      • Swift Canal Failure
    • Earthquake Engineering >
      • Barney Dam Seismic Analysis
      • Fern Hill WTP Liquefacation Study
      • Bull Run No. 2 Seismic Stability Analysis
      • Mt. Tabor Seismic Stability Analysis
      • Port Westward Power Plant Seismic Design
    • Rock Slopes and Tunnels >
      • Libby Rockfall Mitigation
      • Sandy River Pipeline Tunnels
      • Ketchikan Third Avenue Extension
      • Sain Creek Water Supply Tunnel
      • Montana Rockfall Hazard Rating System
    • Foundations >
      • Port Westward Power Plant
      • Cascade Locks Casino
      • Air National Guard Hangar
      • Biglow Canyon Windfarm
      • Oakridge Water System Improvements
    • Concrete Dams and Locks >
      • John Day Lock & Dam
      • Marmot Dam Removal
      • The Dalles Dam
      • Willamette Falls Dam
      • Bonneville Dam
    • Transportation >
      • OTIA Cracked Bridge Geotechnical Baselines
      • Newburg Dundee Bypass Design DEIS
      • I-84 Sandy River Bridge Investigation
      • Tanana River Bridge Foundation, Tok, Alaska
      • Montana RHRS Implementation
      • Ketchikan Third Avenue Extension
    • Ports and Airports >
      • Navy CVN Drydock
      • Depoe Bay Seawall Distress
      • Willamette Falls Flow Control Structure
      • Air National Guard Hangar
    • Water and Wastewater >
      • Fern Hill Water Treatment Plant
      • Tualatin Valley North Transmission Line
      • Evaluation of 28 Water Storage Facilities
      • City of Sandy Water Treatment Plant
      • Mt. Tabor Reservoir No. 5 Cap Study
      • Oakridge Water System Improvements
  • Staff
  • Resources
  • Careers
    • Geotechnical Engineer
  • Contact Us