Cornforth Consultants
  • Home
  • Services
    • Earth & Rockfill Dams
    • Reservoirs, Canals, and Levees
    • Spillway Safety Inspections
    • Landslides and Rockfall
    • Earthquake Engineering
    • Geologic Hazards
    • Geotechnical Site Characterization
    • Hydrogeology
    • Expert Witness
    • Concrete Dams and Locks
    • Geotechnical Instrumentation
    • Deep and Shallow Foundations
    • Geotechnical Manuals
  • Industries
    • Water Resources
    • Energy
    • Natural Resources
    • Industrial
    • Transportation
    • Ports and Airports
    • Expert Witness
  • Projects
    • Earth and Rockfill Dams >
      • Barney Reservoir
      • Frog Lake Reservoir
      • Iron Gate Dam Raise
      • McGuire Dam Raise
      • Bonneville Cofferdam
      • Bull Run No. 2 Seismic Stability Analysis
    • Levees and Canals >
      • Libby Dike Rehab.
      • St. Johns Dike Stabilization
      • Cowlitz River Levees
      • Swift Canal Failure
    • Earthquake Engineering >
      • Barney Dam Seismic Analysis
      • Fern Hill WTP Liquefacation Study
      • Bull Run No. 2 Seismic Stability Analysis
      • Mt. Tabor Seismic Stability Analysis
      • Port Westward Power Plant Seismic Design
    • Rock Slopes and Tunnels >
      • Libby Rockfall Mitigation
      • Sandy River Pipeline Tunnels
      • Ketchikan Third Avenue Extension
      • Sain Creek Water Supply Tunnel
      • Montana Rockfall Hazard Rating System
    • Foundations >
      • Port Westward Power Plant
      • Cascade Locks Casino
      • Air National Guard Hangar
      • Biglow Canyon Windfarm
      • Oakridge Water System Improvements
    • Concrete Dams and Locks >
      • John Day Lock & Dam
      • Marmot Dam Removal
      • The Dalles Dam
      • Willamette Falls Dam
      • Bonneville Dam
    • Transportation >
      • OTIA Cracked Bridge Geotechnical Baselines
      • Newburg Dundee Bypass Design DEIS
      • I-84 Sandy River Bridge Investigation
      • Tanana River Bridge Foundation, Tok, Alaska
      • Montana RHRS Implementation
      • Ketchikan Third Avenue Extension
    • Ports and Airports >
      • Navy CVN Drydock
      • Depoe Bay Seawall Distress
      • Willamette Falls Flow Control Structure
      • Air National Guard Hangar
    • Water and Wastewater >
      • Fern Hill Water Treatment Plant
      • Tualatin Valley North Transmission Line
      • Evaluation of 28 Water Storage Facilities
      • City of Sandy Water Treatment Plant
      • Mt. Tabor Reservoir No. 5 Cap Study
      • Oakridge Water System Improvements
  • Staff
  • Resources
  • Careers
    • Geotechnical Engineer
  • Contact Us

Geotechnical Instrumentation


Seepage ADAS Monitoring Piezometers & FlowmetersSeepage ADAS Monitoring Piezometers & Flowmeters
Cornforth Consultants has extensive experience planning, installing, monitoring, and maintaining specialized geotechnical instrumentation and data acquisition systems. Our project experience ranges from large, complex instrumentation programs involving hundreds of sensors and cloud-based data backup to very small projects involving standalone, manually read instruments.

Cornforth Consultants develops instrumentation strategies to support design efforts for landslides, rock slopes, tunnels, dams, and other civil infrastructure. Our systems cans be designed for standalone operation or can be integrated into a project's existing surveillance and monitoring program. We are firm believers that the simplest system that fits the project needs is the best system, and our engineers work with our clients to develop systems that are cost effective and easy to use.

Representative projects highlighting Cornforth Consultants' instrumentation services are listed below.


Representative Projects:

  • Frog Lake Dam and Landslide Instrumentation
  • Equatorial Guinea LNG Facility
  • Badrock Canyon Rock Joint Instrumentation
  • Barney Dam Instrumentation​
  • ​Ashton Dam Seepage Investigation
  • Ives Island Instrumentation
  • Depoe Bay Marina Instrumentation​

Services Offered for Concrete Dams and Locks:

  • Inclinometer Installation & Data Analysis
  • Single Channel and Multichannel Data Loggers
  • Automated Data Acquisition Systems (ADAS)
  • Online Data Management
  • Standpipe Piezometers
  • Site Layout
  • Vibrating Wire Instrument Installation
  • In-Place Inclinometers
  • Data Management
  • Historical Data Review
  • Extensometers
  • Settlement Monitoring
  • Home
  • Services
    • Earth & Rockfill Dams
    • Reservoirs, Canals, and Levees
    • Spillway Safety Inspections
    • Landslides and Rockfall
    • Earthquake Engineering
    • Geologic Hazards
    • Geotechnical Site Characterization
    • Hydrogeology
    • Expert Witness
    • Concrete Dams and Locks
    • Geotechnical Instrumentation
    • Deep and Shallow Foundations
    • Geotechnical Manuals
  • Industries
    • Water Resources
    • Energy
    • Natural Resources
    • Industrial
    • Transportation
    • Ports and Airports
    • Expert Witness
  • Projects
    • Earth and Rockfill Dams >
      • Barney Reservoir
      • Frog Lake Reservoir
      • Iron Gate Dam Raise
      • McGuire Dam Raise
      • Bonneville Cofferdam
      • Bull Run No. 2 Seismic Stability Analysis
    • Levees and Canals >
      • Libby Dike Rehab.
      • St. Johns Dike Stabilization
      • Cowlitz River Levees
      • Swift Canal Failure
    • Earthquake Engineering >
      • Barney Dam Seismic Analysis
      • Fern Hill WTP Liquefacation Study
      • Bull Run No. 2 Seismic Stability Analysis
      • Mt. Tabor Seismic Stability Analysis
      • Port Westward Power Plant Seismic Design
    • Rock Slopes and Tunnels >
      • Libby Rockfall Mitigation
      • Sandy River Pipeline Tunnels
      • Ketchikan Third Avenue Extension
      • Sain Creek Water Supply Tunnel
      • Montana Rockfall Hazard Rating System
    • Foundations >
      • Port Westward Power Plant
      • Cascade Locks Casino
      • Air National Guard Hangar
      • Biglow Canyon Windfarm
      • Oakridge Water System Improvements
    • Concrete Dams and Locks >
      • John Day Lock & Dam
      • Marmot Dam Removal
      • The Dalles Dam
      • Willamette Falls Dam
      • Bonneville Dam
    • Transportation >
      • OTIA Cracked Bridge Geotechnical Baselines
      • Newburg Dundee Bypass Design DEIS
      • I-84 Sandy River Bridge Investigation
      • Tanana River Bridge Foundation, Tok, Alaska
      • Montana RHRS Implementation
      • Ketchikan Third Avenue Extension
    • Ports and Airports >
      • Navy CVN Drydock
      • Depoe Bay Seawall Distress
      • Willamette Falls Flow Control Structure
      • Air National Guard Hangar
    • Water and Wastewater >
      • Fern Hill Water Treatment Plant
      • Tualatin Valley North Transmission Line
      • Evaluation of 28 Water Storage Facilities
      • City of Sandy Water Treatment Plant
      • Mt. Tabor Reservoir No. 5 Cap Study
      • Oakridge Water System Improvements
  • Staff
  • Resources
  • Careers
    • Geotechnical Engineer
  • Contact Us